Wednesday 30 January 2013

A bad week!

This week was set aside as the week in which we filmed the majority of our footage, however it was a D.I.S.A.S.T.E.R. Firstly there was a horrendous downpour of snow this with my illness made filming impossible for this week this therefore our rough cut was horribly under done. Due to this we have fallen behind schedule.

Thursday 17 January 2013

Shooting schedule.


In this I will be describing in more detail the different shots and the overall plan for music video of Arctic Monkeys ‘I bet you look good on the dancefloor’

Shot 1:

   Location Weston College- University Campus.
   Shot type- Master shot, Wide shot
   Action- Performance based shot of an entire band playing (Bass, Guitar, Drums, Singer) Shot will last around 20 seconds
   Date- 18/12/12 Midday
Shot 2:

   Location: Weston College- University campus
   Shot type- Panning shot, Close up or Extreme close up
   Action- continuing with the performance aspect but with a close up shot off all the band members faces in a panning motion. Shot will last around 5 seconds
   Date- 18/12/12 Midday
Shot 3:

   Location: Hutton - 5 Weston way (My house)
   Shot type- Mid shot of the back, green screen for the mirror
   Action- First theme of narrative, Lead actor (me) looking into a mirror and sees a girl in it instead of him, it is the girl he is thinking about. Shot lasts around 3 seconds
   Date- 
Shot 4

   Location: Hutton - 5 Weston way (My house)
   Shot type- Mid shot, Shot reverse shot
   Action- Close up shot of the "Mirror" and the girl in the camera. Shot lasts around 3 seconds
   Date-
Shot 5
   Location - Hutton - 5 Weston way (My house)
   Shot type- Close up, Shot reverse shot
   Action- Reverse close up shot of the Lead and showing his reaction to seeing the girl in the mirror 
   Date-
Shot 6
   Location - Hutton - 5 Weston way (My house)
   Shot type -
   Action-
   Date-
Shot 7
   Location - Weston college University Campus
   Stot type- 
   Action-
   Date- 18/12/12 Midday
Shot 8
   Location- Weston seafront
   Shot type-
   Action-
   Date-
Shot 9
   Location- Weston College University Campus
   Shot type-
   Action-
   Date- 18/12/12 Midday
Shot 10
   Location- Weston College University Campus
   Shot Type-
   Action-
   Date- 18/12/12
Shot 11
   Location- Weston-Super-Mare: Town Centre
   Shot type-
   Action-
   Date- 
Shot 12
   Location- Weston-Super-mare: Town Centre
   Shot type- 
   Action-
   Date-
Shot 13
   Location- Green Screen- Weston College
   Shot type-
   Action- Explosion
   Date-
Shot 14
   Location Green screen- Weston College
   Shot type-
   Action- Rio de Janeiro
   Date- 18/12/12 Midday
Shot 15
   Location- Weston Super Mare: Town Centre
   Shot type-
   Action- Close up of two People
   Date-
Shot 16
   Clip from Youtube
   Date- 18/12/12 Midday
Shot 17
   Location- Hutton - 5 Weston way (My house)
   Shot type- Low angle shot
   Action- 
   Date-
Shot 18
   Location- Hutton - 5 Weston way (My house)
   Shot type- High angle shot
   Action-
   Date

Evidence of copyright bypass.


Wednesday 16 January 2013

Just a thought..

I was thinking of the scene in which Ben is walking behind a group of girls on there way into town. I believe that this will look more realistic if we use a go pro camera in stead of the normal camera. i feel it will provide the audience with the perfect proof that  hes behind them and the realism of the camera movement will related to it being a dream that we all will have and not just a video proffesionally put toghether and made to look perfect and unnatural.

Second day of filming.

On the second day of filming we did the first half of the bathroom scene in which Ben is shaving and getting ready for his night out. I arrived early that day to set up the props, camera and lighting so we could get straight into the filming. When Ben arrived we got straight into it and had a successful day of filming but as we only had to film around 20 seconds of filming it did'nt take alot of time.

Monday 7 January 2013

Chorus shoot!

On the first day of filming we completed the chorus, this shoot was based at Weston college (Weston-s-mare) This shoot went largely to schedule all completed in the time we previously arranged. This shoot included all of the props which were Mic, guitar and costumes.  In this shoot we used several shots that were listed in the pre production. Overall i think that this day of filming was good and provided us with a decent mount of clips that can be used in the final piece.